PROJECT SNAPSHOT
A major transport infrastructure initiative required precision MEP documentation and Revit modelling to support the delivery of a new underground tunnel system. Away Digital provided a dedicated team to manage delivery from design to construction sequencing, with an emphasis on coordination, accuracy and speed.
SERVICES DELIVERED
- 3D Revit modelling
- MEP documentation
- Design and construction sequencing support
- Ongoing site update integration
KEY DELIVERABLES
- Fully coordinated 3D Revit MEP models
- Construction documentation aligned to buildability requirements
- Real-time integration of site updates into documentation sets
PROJECT CHALLENGES
Coordinating services within extremely constrained tunnel environments
Compressed delivery deadlines on packages critical to construction sequencing
Frequent design updates requiring rapid model change implementation
High rework risk due to cross-discipline misalignment
KEY OUTCOMES
- Documentation delivered three weeks ahead of schedule
- Approximately 60% cost savings vs local-only resourcing
- Reduced clash risks through proactive early coordination
- Improved model consistency and version control across all sets
By embedding a specialist MEP team into the client’s engineering group, Away Digital helped mitigate schedule pressure, reduce coordination risk and deliver faster, more consistent documentation at scale. The team integrated directly into client QA and coordination workflows to provide continuous delivery certainty across phases.