Architectural documentation for a UK residential block


PROJECT SNAPSHOT

A large-scale residential project in the UK across multiple buildings. Away Digital delivered design development documentation for this multi-storey complex, working from outdated drawings and a highly complex existing structure to produce coordinated, compliant drawings against an active program.


SERVICES DELIVERED

  • Revit modeling to meet design requirements against existing building conditions
  • Coordination of service drawings with existing MEP layouts
  • Detailing and documenting graphics aligned to UK building standards

KEY DELIVERABLES

  • Redrawn and updated wall and ceiling models coordinated with existing MEP layouts
  • Architectural partition drawings aligned to a highly complex existing structural model
  • Localized drawings compliant with UK building standard regulations and project-specific clearance requirements

PROJECT CHALLENGES

  • A six-hour time zone gap risked delaying resolution of RFIs raised during the working day
  • The UK market brought unfamiliar compliance standards and building regulations that the team learned and adapted quickly to keep pace with delivery
  • The existing building’s irregular walls, low structural beams and outdated drawings made it difficult to model compliant wall and ceiling layouts with confidence

KEY OUTCOMES

  • RFI turnaround maintained by resolving queries through direct team chat at the end of the Vietnam working day, ready for the UK team each morning 
  • Wall and ceiling layouts adapted precisely around irregular existing structure while meeting UK compliance requirements 
  • Ceiling heights optimized to maximize room space while maintaining clearance below existing structural beams for service runs 
  • Client gained full confidence in the team’s ability to deliver accurate, compliant drawings despite the time zone gap 
e1f105d679430272a86b64bce6efb1aa3f3b98b1

This project demonstrated Away Digital’s ability to deliver complex documentation in a new international market. By resolving the time zone gap through direct communication and methodically applying UK compliance requirements to a highly irregular design and structure, the team delivered accurate, compliant drawings without disrupting program pace.

 

Prev
Reducing CAD rework with dedicated teams: Lessons from 12+ years in outsourcing
Next
How architecture firms build a high-output team without hiring in-house

Ready to enhance your project delivery capabilities?

Let’s work together to bring your vision to life.