Project snapshot
A large-scale mixed-use precinct in Australia delivering residential, commercial and civic spaces across three high-rise towers and a heritage market square. Away Digital provided full DD documentation and BIM coordination to support complex multi-discipline integration.
Project Overview
Location – Australia
Sector – Commercial / Mixed-use
Duration – 1 year
Scope of work
Project stage: design documentation
Scale: mixed-use precinct, including:
- Multiple High-rise buildings:
- Tower Comprising of Basement, Commercial, Residential and Retail integrated at podium levels.
- Tower Storeys: Ranging between 35 to 55 storeys.
Team: 1 Team Leader + 5 Architects
Services delivered:
- Revit modelling
- BIM model QA and compliance checking
- Façade modelling and documentation
- Fully coordinated service drawings across multiple disciplines
- Complete DD documentation packages aligned with Australian Standards
Project challenges
- Maintaining BADS compliance while preserving design intent amendments across three tower types and complex podium levels
- Ensuring all documentation updates were fully coordinated across design amendments in the entire Revit model
Key outcomes
- Documentation delivered on schedule with minimal rework
- Early QA and design alignment reduced coordination clashes by 60%
- Increased drawing quality and modelling consistency across all packages
This project demonstrated Away Digital’s capability to manage large-scale, multi-tower developments with complex coordination requirements. Through structured QA processes, disciplined BIM management and consistent alignment across teams, we delivered a complete documentation package that met compliance, maintained design intent and strengthened delivery confidence for the client.