When drawings slow down, everything stops: The documentation problem facing industrial contractors
There’s a moment every VDC manager recognizes. Fabrication is scheduled, the shop is ready, materials are on site – but the drawings aren’t there. It might be a high-volume isometric run that’s two weeks behind. It might be a model that arrived from the engineering firm without enough detail to go straight to fabrication. Either way, the result is the same: the […]



