Project snapshot
A 55+-storey residential tower in Australia requiring full DD and construction documentation. Away Digital supported the project from model development through to final façade detailing and coordinated service drawings.
Project overview
Location: Australia
Sector: Student accommodation
Duration: 2 years 3 months
Scope of work
Project stage: Design development and construction drawing packages
Scale: 55+-storey tower with basements, approximately 70,000+ sqm GFA
Team: 1 Team Leader + 5 Architects
Services delivered:
- Revit modelling for design documentation
- Coordination of services drawings
- Development of construction-level detailing and graphical documentation
Key deliverables
- Full design and construction drawing sets for tower and podium
- Coordinated services drawings across architectural and structural packages
- Façade modelling and consultant coordination for final documentation
Project challenges
- Tight deadlines combined with ongoing model updates
- Delays in receiving feedback from consultants and builders created bottlenecks
Key outcomes
- Timely model alignment and downstream rework avoided
- Future delays prevented through proactive coordination and transparent decision-making
Project summary
This project reinforced Away Digital’s reputation for responsiveness and documentation clarity. Through proactive coordination and strong Revit execution, the team delivered a complex tower package aligned to evolving design inputs and construction requirements.